top of page
HOME
WHAT IS IT?
INTEGRATIONS
WHO ARE WE?
CLIENTS
PARTNERS
CONTACT
More
Use tab to navigate through the menu items.
C&J Electrical SWMS
SWMS 001 - Planning and Preparation
SWMS 002 - Manual Handling
SWMS 004 – Conduit Installation
SWMS 003 – Excavations (less than 1.0 metre)
SWMS 005 – Installation of Cable Tray _ Cable Ladder
SWMS 006 – Installation of Light Fittings
SWMS 007 – Installation of Switchboard_Enclosure_Data Rack
SWMS 008 – Installation of Temporary Power
SWMS 009 – Installation of Truncking Cable, Mains or Submains
SWMS 010 – Fitting off Electrical Equipment
SWMS 011 – Isolation and Testing of Energy Sources
SWMS 012 – Testing and Commissioning Live Equipment
SWMS 013 – Demolition
SWMS 014 – Working in Ceiling Spaces
SWMS 015 – Working with Asbestos Containing Material (ACM)
SWMS 016 - Working with Elevated Work Platforms
SWMS 017 – Installation of Communications Cabling (Copper _ Fibre)
SWMS 018 – Scaffolding
SWMS 019 – Working in Risers
SWMS 020 - Working in Confined Space
SWMS 021 - Working at Heights
SWMS 022 - Using Portable Ladders
SWMS 023 - Equipment Installation
SWMS 024 - Insulation
SWMS 025 - Internal Cleaning of Ductwork
SWMS 026 - Ventilation Cleaning
SWMS 027 - Power_Control Wiring
SWMS 028 - Refrigerant Handling
SWMS 029 - Storing _ Handling Refrigerant
SWMS 030 - Commissioning an AC Unit
SWMS 031 - Gas Welding _ Soldering
SWMS 032 - Core Hole Drilling
SWMS 033 – Hazardous Substances
SWMS 034 - Install Replace a Split System AC Unit
SWMS 035 - Installation of Grid Connected Photovolaic System
bottom of page