top of page
HOME
WHAT IS IT?
INTEGRATIONS
WHO ARE WE?
CLIENTS
PARTNERS
CONTACT
More
Use tab to navigate through the menu items.
Rolray SWMS
SWMS 000 - Template.pdf
SWMS 001 - Manual Handling
SWMS 002 - Conduit Installation (Underground)
SWMS 003 - Conduit Installation (Walls and Ceilings)
SWMS 004 - Cable and Ladder Tray Installation
SWMS 005 - Installing Light Fittings
SWMS 006 - Installation of Switchboards
SWMS 007 - Installation of Pole Mounted Switchboard (Temp Site Power)
SWMS 008 - Lighting Looms
SWMS 009 - Installation of Cable Supports
SWMS 010 - Installation of Mains
SWMS 011 - Installation of Submains
SWMS 012 - Installation of Power and Light Cabling
SWMS 013 - Installation of Power Points
SWMS 014 - Working with Elevated Work Platforms
SWMS 015A - Scissor Lift - Boom Lift - Cherry Picker
SWMS 015B - Crane Lift
SWMS 016 - Scaffolding
SWMS 017 - Working at Heights
SWMS 018 - Working in Confined Space
SWMS 019 - Working in Risers
SWMS 020 - Working on Roofs and Ceiling Spaces
SWMS 021 - Installation of Equipment Racks
SWMS 022 - Installation of Fibre Optic Cable
SWMS 023 - Installation of Trunk Cabling
SWMS 024 - Installation of Outlet Cabling
SWMS 025 - Installation of Outlets
SWMS 026 - Installation of Pyrotenax (MIMS) Cable
SWMS 027 - Installation of Grid Connected Photovoltaic System
SWMS 028 - Installation of New Rack Cabinet
SWMS 029 - Installation of Selv Cabling (Data - Security - Nurse Call etc)
SWMS 030 - Installation of Data - TV - Nurse Call Points
SWMS 031 - Installation of Light Poles
SWMS 032 - Isolation and Testing of Energy Sources
SWMS 033 - Working on Energised Low Voltage Equipment Apparatus
SWMS 034 - Minor Work on Asbestos Containing Material
SWMS 035 - Electrical Demolition Work
SWMS 036 - Trenching
SWMS 037 - Testing and Tagging Electrical Equipment
SWMS 038 - Energise and Commission Installation
SWMS 039 - Core Drill Operations
SWMS 040 - Electrical Commissioning
SWMS 041 - Insulating Oil PCB Removal
SWMS 043 - Installation of Cable Supports
SWMS 044 - Installing Ceiling Mounted Lights and Speakers
SWMS 045 - Installation of Switchboard Connections (New Switchboard)
SWMS 046 - Installation of New Work in Existing Switchboards - Not Live Work
SWMS 047 - Silica Dust
SWMS 048 - Protection Relay Testing
SWMS 049 - Testing and Commissioning Battery Chargers
SWMS 100 - High Voltage Switchgear Termination (XLPE)
SWMS 101 - High Voltage Switchgear Termination (PILC)
SWMS 102 - High Voltage Pole Top Termination (PILC)
SWMS 103 - High Voltage Pole Top Termination (XLPE)
SWMS 104 - High Voltage Straight Joint (XLPE TO XLPE)
SWMS 105 - High Voltage Straight Joint (XLPE TO PILC)
SWMS 106 - Testing of Earth Grid
SWMS 107 - Testing of Power Transformer
SWMS 108 - Testing of High Voltage Switchgear
SWMS 109 - Accessing High Voltage Cables and Apparatus
SWMS 110 - Working on Energised Low Voltage Cables and or Equipment
SWMS 111 - HV Switching
SWMS 112 - Identify and Spike HV Cable
SWMS 113 - Use of Gas Torch for Heat Shrink Applications
SWMS 114 - Working in an Outdoor Environment
SWMS 115 - Test and Commission High Voltage Apparatus
SWMS 116 - Set Up and Safely Work from an EWP
SWMS 117 - VLF Testing of High Voltage Cables
SWMS 118 - Excavation Near Underground Services
SWMS 119 - Construction Activity - Working in a Trench
SWMS 121 - Operational Activity - Use of Hazardous Substances Within the Workplace
SWMS 122 - Non Intrusive Partial Discharge Testing.pdf
SWMS 123 - Substation Earth Grid Construction.pdf
Rolray Insurances
COC - Business Insurance
COC - Motor Vehicle Insurance
COC - Public Liability Insurance
COC - Work Cover
Rolray Policies
Policy 1 - Quality Policy
Policy 2 - Health & Safety
Policy 3 - Environmental Policy
Rolray SDS
Chemical and Hazardous Substance Register
bottom of page